| Steel making Division | |
| 1. Energy Optimising Furnace | |
| Commissioning | Aug 1998 |
| Capacity of EOF | 50 MT |
| Shuttle Type Bottom change | |
| Water cooled roof & side walls | |
| Oxygen lancing through four tuyeres, four atmospheric injectors & TWO supersonic lance.16.4 m | |
| Automatic lime and ferro alloy addition system | |
| PLC process control | |
| 2. Ladle Refining Furnace | |
| No of LRF | 2 Nos |
| Transformer Capacity | 10 MVA |
| Automatic lime & ferro-alloy feeding system | |
| Optimal alloy calculation program | |
| Argon Purging System | |
| Four strand Core Wire feeding system | |
| Heating rate 5 o C /min | |
| Level 2 Automation | |
| Oxygen Probe | |
| 3. Vaccum Degassing | |
| Technology | ALD Germany |
| No Of VD Stations | Two |
| Commissioning | March 1999 |
| Boiler Capacity | 14 Tons/hr |
| Vacuum System | 5 stage steam ejectors |
| Vacuum Level | 0.65 mbar |
| Suction Capacity |
|
| Double alloying hoppers for trimming under vacuum | |
| Level 2 Automation | |
| 4. Bloom Caster | |
| Technology | Techint / Pomini |
| Commissioning | August 1998 |
| No. of strands | Two |
| Sections (mm) | 240X280, 160 , 200, 220 rounds |
| Multi Radius Machine | 10/18 m |
| Ladle Turret for quick change over | |
| Auto Mould Level Control | |
| Combi Electromagnetic Stirrer | |
| Quality Tracking System | |
| Automatic presetting of process parameters | |
| Length Optimization | |
| Synchronized Secondary Cooling System | |
| 5. Billet Caster | |
| Technology | Techint / Pomini |
| Commissioning | March 1999 |
| No. of strands | Three |
| Sections | 120X120 , 160X160, 200x200 mm sq |
| Multi radius Machine | 9/16 m |
| Ladle Turret for quick change over | |
| Auto Mould Level Control | |
| Combi Electromagnetic Stirrer | |
| Quality Tracking System | |
| Automatic presetting of process parameters | |
| Length Optimization | |
| Synchronized Secondary Cooling System | |